Proper Operating Techniques
Avoid Shock Loads: Operate smoothly. Avoid swinging abruptly into piles or using the machine as a wrecking ball.
Engage Swing Lock: Always engage the swing lock before transporting the machine.
Vary Swing Positions: When parked for short breaks, rotate the house to a new position to change the load points on the bearing.
Post-Operation Cleaning: After working in mud or water, clean the slewing bearing area to prevent debris buildup that can damage seals.
This 397-9666 slewing bearing is used for 365L excavator.






Related part number:
227-6076
3B-8489
148-4685
352-7064











