Installation Steps:
Lubrication: Apply a thin layer of grease to the surface of the new pin. This aids installation and provides initial lubrication.
Alignment: Carefully align the components (e.g., lift arm and frame) so the bore holes are perfectly in line. Using alignment tools or a tapered drift punch can be helpful.
Driving the Pin: Use a soft-faced mallet or a hydraulic press to gently drive the pin into place. Never use a steel hammer directly on the pin, as this can damage the precision-machined surface or the threads for retaining bolts.
This 1U-0872 pin is used for D7R dozer.






Related part number:
8E-6754
8E-6755
8E-6756
6J-5342
7X-0365
1U-0872











