Installing bushings on a 320D is a precise task that requires the right tools and techniques. Incorrect installation is a leading cause of premature failure.
Key Tools and Equipment:
Hydraulic Press: Essential for applying the controlled, axial force needed to press bushings in and out. Using a hammer can damage the bushing, bore, and surrounding structure.
Arbors and Mandrels: Specifically sized pressing tools (often part of a special tool set) to ensure force is applied evenly to the bushing's outer ring, not the inner surface.
Dial Caliper/Micrometer: For measuring the bore of the linkage, the outside diameter (OD) of the new bushing, and the pin diameter to ensure correct clearances.
Cleaning Supplies: Degreaser, brushes, and rags to thoroughly clean the housing bore and the new pin.
Alignment Tools: Drift pins or bars to help align the components during reassembly.
This 241-7380 bushing is used for 318D 318D2 320D excavator.






Related part number:
7Y-5116
7Y-5119
9X-3592
087-5507
126-2043
143-8027
147-5835
165-9286
229-1132
247-8789
266-7801
260-2529
289-8134
241-7380
143-8035
147-5837
170-9844
087-5510
095-1717
114-0756
170-9860
7Y-5216
266-7806











